The cost cycle of condominium projects under TFRS

A six-phase framework from land purchase to ownership transfer, showing which costs to capitalise or expense, with examples

Key takeaways

  • Condo costs fall into six phases, and each phase requires a decision to capitalise or expense
  • Land and construction costs sit in WIP under TAS 2, interest follows TAS 23, and incremental commissions are recognised as a contract cost asset under TFRS 15
  • Advertising and marketing materials are expensed immediately
  • Money received from customers is a liability until control is transferred, which is generally the ownership transfer day

A condominium development has a long cost cycle, from land acquisition, design, permitting and construction through presales to ownership transfer. For each item you must decide whether to capitalise or expense it under the relevant standards: TAS 2, TAS 23 and TFRS 15. This article sets out a six-phase framework with sample figures, so that project executives and the finance team can see how the recording works as a system. The account codes use the 11010–11060 structure as an example.

Phase 1: Land acquisition

Costs directly related to acquiring the land are recorded in the WIP-Land account until the condominium units are transferred to customers. Under TAS 2, the cost of inventory comprises purchase costs, conversion costs and other costs incurred in bringing the inventory to its present location and condition.

Item (example)THB million
Land price170.0
Transfer fee and legal fees0.8
Land tax during development3.2
Total land cost (11010)174.0

Phase 2: Pre-construction work (design, EIA, permits)

Record these in WIP-Soft Costs, because they are directly related to bringing the project to a saleable condition. These costs would not be incurred if there were no project.

Item (example)THB million
Architectural design fees6.5
Project management fees (only the portion directly related to the project)22.0
Construction management consultancy fees2.5
EIA report fees and legal fees0.6
Total WIP-Soft Costs (11030)31.6

Phase 3: Construction

Item (example)AccountTHB million
Main construction contract11020215.0
Piling, soil testing and civil works1102013.0
Other direct construction work1102018.0
Depreciation of vehicles used on site110200.2
Total WIP-Hard Construction246.2
Interest on construction loans (IDC)110400.2

TAS 23 requires borrowing costs directly attributable to a qualifying asset to be capitalised. Capitalisation begins when the conditions are met and stops when substantially all the activities needed to prepare the asset for sale are complete. After that, interest is expensed.

Sales gallery: In principle, a sales gallery is not part of the units being sold, so it should not automatically go into WIP. If it is a temporary building used for more than one period, consider treating it as PPE and depreciating it over the sales period. Only work that remains as part of the property delivered can go into WIP. In the article's example the amount is THB 60 million, shown separately from the WIP balance. Agree the classification with the auditor from the outset.

Phase 4: Presales and marketing

This phase is the most complex, because the costs fall clearly into two groups

Group A: capitalise under TFRS 15 paragraph 91 (costs to obtain a contract)

These must be incremental costs that would not have been incurred without a contract with a customer.

Item (example)Accounting treatmentTHB million
Commission to external agents11050 Paid when a contract has been signed.43.0
Commission to sales staff11050 Only the portion tied to closing a contract. Base salary is an expense.4.0

Group B: expense immediately

Selling expenses are excluded from inventory cost under TAS 2 paragraph 16, and expenditure on advertising and promotion is expensed as incurred under TAS 38 paragraph 69

Item (example)THB million
Advertising costs2.5
Marketing materials and collateral7.5
Sponsorships or donations for PR6.5
Marketing activities and events1.0
Total selling expenses17.5

Rule of thumb: If an expense cannot be linked to a specific condominium unit sale contract, recognise it as an expense immediately.

Phase 5: Sales and revenue recognition

When a customer signs the sale and purchase agreement (SPA), the money received is a contract liability, not revenue, and WIP remains on the balance sheet. For Thai condominium unit sales, the performance obligation is generally satisfied at a point in time when control is transferred, which is the ownership transfer day. Recognition over time under TFRS 15 paragraph 35 must meet specific conditions, which have to be assessed from the contract and the law.

Example: Cumulative customer receipts of THB 700 million are shown under liabilities and are not recognised as revenue until ownership transfer.

Phase 6: Construction completion and ownership transfer

  • Release WIP to COGS in proportion to the units transferred
  • Amortise the contract cost asset (11050) to selling expenses as units are delivered
  • Transfer the contract liability to revenue
  • Stop capitalising IDC when the project is ready for sale

Cost position summary (sample project)

ItemTHB millionRecording status
WIP-Land (11010)174.0Capitalise
WIP-Hard Construction (11020)246.2Capitalise
WIP-Soft Costs (11030)31.6Capitalise
WIP-Borrowing Costs (11040)0.2Capitalised subject to the TAS 23 conditions
Total WIP452.0
Sales Gallery60.0Separate from WIP; consider PPE or expense
Agent Commission43.0Contract Cost Asset (11050)
Customer receipts700.0Liability; recognised on ownership transfer
Revenue already recognised0.0Awaiting handover

Recommendations before the year-end close

  1. Check that eligible agent commissions are not left in expenses, and reclassify them to the contract cost asset under TFRS 15 paragraph 91.
  2. Set a policy for amortising the contract cost asset that is consistent with the unit handover schedule.
  3. Review marketing and sales gallery costs to make sure no items that should be expensed remain in WIP.
  4. Set the date the project is ready for sale, so that IDC capitalisation stops under TAS 23.
  5. Review the cut-off of customer receipts against contracts and transfers.

Conclusion

The condo cost cycle requires an understanding of several standards at once. The classification between capitalising and expensing directly affects the balance sheet, financial ratios and the tax base. Setting up the accounting system from the first phase, a chart of accounts that clearly separates WIP, and continuous communication with the auditor will allow the project to close its accounts correctly and reflect true operating results.